ODOT Highway-Rail Intersection Advanced Safety Systems
Description
Install advanced Highway–Rail Safety Systems at key crossings. A study must be conducted to identify the crossings and the preferred system.
Status: Planned
Timeframe: Long
Stakeholders
Inventory
ODOT District 4 Traffic Signal Roadway Equipment |
---|
ODOT Traffic Signal Control System |
---|
Railroad Wayside Equipment |
---|
Services
TM14–Advanced Railroad Grade Crossing: ODOT District 4 |
---|
Interfaces
Source | Flow | Destination | Status |
---|
ODOT District 4 Traffic Signal Roadway Equipment | rail crossing blockage notification | ODOT Traffic Signal Control System | Planned |
---|
ODOT District 4 Traffic Signal Roadway Equipment | rail crossing blockage notification | Railroad Wayside Equipment | Planned |
---|
ODOT District 4 Traffic Signal Roadway Equipment | rail crossing operational status | Railroad Wayside Equipment | Planned |
---|
ODOT District 4 Traffic Signal Roadway Equipment | rail crossing status | ODOT Traffic Signal Control System | Planned |
---|
ODOT Traffic Signal Control System | rail crossing control data | ODOT District 4 Traffic Signal Roadway Equipment | Planned |
---|
ODOT Traffic Signal Control System | rail crossing request | ODOT District 4 Traffic Signal Roadway Equipment | Planned |
---|
Railroad Wayside Equipment | arriving train information | ODOT District 4 Traffic Signal Roadway Equipment | Planned |
---|
Railroad Wayside Equipment | track status | ODOT District 4 Traffic Signal Roadway Equipment | Planned |
---|